PEB Construction and Manufacturing Company in India

Engineering-led PEB manufacturer and integrated industrial construction company. Own plant. Civil and steel under one contract.

A pre-engineered building is a steel structure whose members are engineered and fabricated to one specific set of loads and dimensions, then bolted together on site. Sections are tapered to the bending moment at each point, so a PEB uses less steel than conventional hot-rolled construction and the programme runs shorter — fabrication happens in the factory while foundation work proceeds on site.

Infra Green is an engineering-led, technology-enabled PEB manufacturer and integrated industrial construction company. We engineer, fabricate and erect pre-engineered buildings with our own teams, at a designed capacity of 1,250 MT per month in our own 60,000 sq ft plant in Pongalur, Tirupur — and we carry out the civil scope too, so foundations and steel are planned as one job rather than two contracts.

1,250 MTDesigned capacity per month
60,000 sq ftCovered fabrication plant
Robotic + CNCYaskawa welding, plasma cutting
Civil + SteelUnder one contract
Components

What You Are Actually Buying in a PEB

Quotations list components. Here is what each one decides about your building — and where the engineering detail sits if you want it.

Primary framing

Decides your column-free span, and therefore how you can lay out machines.

Primary framing systems →

Secondary framing

Purlins and girts decide sheet spans and how much steel sits above your head.

Secondary framing systems →

Roof & wall cladding

Decides internal temperature, daylight, and how often you will be back on the roof.

Roofing and wall systems →

Cranes & mezzanines

Must be decided before the frame is designed. Retrofitting a crane into a building not designed for one is expensive.

Cranes and mezzanines →

Connections & accessories

Bolts, anchors, flashings, gutters, ventilators — where cheap quotes quietly save money.

Products and accessories →

Want the engineering detail?

Component-by-component breakdowns, design parameters and framing configurations.

Components of a PEB →
PEB design & engineering →
Specifications

PEB Specifications at a Glance

The values we design and fabricate to. Bring these to any comparison — a quote that will not state them is not a comparable quote.

ParameterSpecification
Primary framingBuilt-up tapered I-section columns and rafters
Secondary framingZ and C purlins, girts, eave struts, bracing systems
Sheeting materialGalvanized, PPGI and PPGL profiled sheets; insulated panels optional
Structure typesWarehouses, factory sheds, textile and garment units, crane sheds, multi-storey, showrooms
Manufacturing capacityDesigned capacity 1,250 MT per month (15,000 MT per year)
Facility60,000 sq ft covered fabrication floor on a 35-acre plot, Pongalur, Tirupur
Steel sourcingTATA Steel, JSW Steel and SAIL to IS 2062; PPGI and PPGL to IS 14246 / IS 15961. Mill Test Certificates verified on every consignment
Quality systemDocumented QMS, calibrated instruments, stage-wise inspection records and heat-number traceability. ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 under application as an integrated management system; ISO 3834-2 planned — see Certifications and Compliance
Design codesIS 800:2007, IS 875 Parts 1–5, IS 801, IS 1893; AISC 360 and MBMA where specified; BS 5950 and EN 1993 (Eurocode 3) for export projects
Design softwareSTAAD Pro (analysis and design), Tekla Structures (3D modelling and connection design), AutoCAD (drafting and tender drawings)
Maximum clear spanLong clear spans using tapered built-up frames. The span is fixed at design stage against your machine layout and racking plan, not sold as a standard figure
Crane capacity handledRunway beams designed for the EOT capacity you specify, checked for impact, fatigue and service deflection to IS 800 / AISC
Surface preparationSand blasting to SA 2½ where specified, followed by airless-applied primer and protective coating
Manufacturing toleranceAs per IS standards and approved client drawings
Export logisticsChennai, Tuticorin and Cochin ports; Coimbatore International Airport approx. 40 km
Scope optionsSupply and erection, or integrated civil + PEB turnkey
In-House Manufacturing

Inside Our PEB Manufacturing Facility

Your frames are cut, assembled, welded, blasted, coated and dispatched at our own 60,000 sq ft plant in Pongalur, Tirupur — designed capacity 1,250 MT per month. Nothing is passed to a third-party fabricator on the way to your site, and the purlins and colour-coated roofing sheets are made on our own lines too.

CapabilityEquipment
Plate cutting3 CNC plasma systems, 2 with Hypertherm plasma technology (USA); 3 hand plasma units
Robotic welding2 Yaskawa robotic welding stations (Japan)
Built-up beamsAutomated PTW + tack welding line (PRIMO, India)
General welding12 MIG and ARC stations across amperage capacities
Forming & punchingIronworker (Taiwan), press brake, shearing machine, threading
Secondary framingPurlin roll-forming line
Roofing productionColour roof profile line, crimping machine
Surface preparation2 sand blasting machines, SA 2½ where specified
Protective coating2 GRACO airless painting systems, LG compressor and dryer
Material handling5 EOT crane systems (Italy), 5 conveyor transfer lines
Inside the manufacturing facility →
Japanese robotic welding, American plasma technology, Italian material handling and Indian precision fabrication, in one plant — a combination that places this facility among the top-tier PEB manufacturing setups in Tamil Nadu.

For a buyer that matters in one practical way: when a purlin run changes mid-project — and it usually does — we reschedule our own factory instead of joining a supplier's queue. That is the reason our programmes hold when a drawing changes late.
Our Difference

Integrated Civil + PEB Construction

Most PEB manufacturers supply and erect steel, and leave the foundation, flooring and masonry to a civil contractor you appoint separately. Two contracts, two programmes, and every delay at the interface becomes your problem.

Infra Green coordinates both. Foundations, RCC elements, plinth, masonry walls, structural steel, roofing and cladding are planned under one agreed scope, with machine foundations and structural framing coordinated from the design stage rather than reconciled on site.

For a manufacturer with a production start date to hit, that single point of accountability is usually worth more than a marginally lower steel rate.

Turnkey industrial construction →
ScopeTypical PEB firmInfra Green
Foundation & RCCYour contractorOurs
Masonry wallsYour contractorOurs
Steel fabricationOften sub-letIn-house
ErectionTheirsOurs
Roofing & claddingTheirsOurs
Contracts to manageTwo or moreOne
Applications

What Different Buildings Demand From a PEB

Floor area is the least useful number in a brief. These are the parameters that actually set the structure — and the cost.

SectorTypical clear spanTypical eave heightWhat drives the design
Warehousing & logistics——Racking layout and vehicle movement set the column grid
Industrial manufacturing——Machine lines and material flow set column positions
Textile processing——Humidity and chemical exposure set coating and ventilation
Garment & production units——Daylight, fresh air and clean spans for flexible floors
Crane-supported baysSet by crane railSet by hook heightImpact and fatigue set the runway beam
Multi-storey & commercial—Per floorFloor loads, vertical stability, future level addition
Cold storage & agro——Insulated envelope and corrosion protection

To complete this table: pull the clear span and eave height actually built on two or three projects in each sector from the drawing archive. Neither the catalogue nor the positioning document records them, and they are the fastest way to make this page outrank a generic manufacturer page.

Completed Work

PEB Projects Delivered

Replace with project photograph
Multi-Storey Steel Structure

CTC International — Tiruppur

G+3, 30,000 sq ft. A multi-storey steel structure rather than a single-storey shed, which is the harder engineering problem: floor loads, vertical stability and connection detailing across four levels — delivered with the civil scope under the same contract.

Replace with project photograph
Integrated Civil + PEB

Sansaj Home Care Products — Pollachi

75,000 sq ft. Our largest of five integrated civil and steel references, with foundation, RCC and steel delivered under one scope and one contract.

See all completed projects →

Quality

Quality Control, Testing and Traceability

Dedicated QC personnel, calibrated instruments and documented inspection formats run from raw-material inward through to dispatch clearance. Heat numbers are traceable from plate to finished member, and every weld is logged against the welder and the procedure used.

For salt spray, tensile, coating adhesion and chemical composition testing we work with NABL-accredited laboratories, and can supply batch-wise third-party reports for tender and export requirements.

The plant runs on role-based safety discipline, weld fume management, structured operator training, PPE discipline and stage-wise supervisor sign-off, with responsible handling of fabrication waste.

You are welcome to visit during fabrication and witness any of these checks.

Fabrication stageInspected
Drawing reviewApproved revision, BOM match
Incoming materialMill Test Certificate against IS 2062, grade, thickness, heat number
CuttingDimensions against drawing, nesting accuracy
Beam fabricationWeld gauges, dye penetrant on critical connections, geometry, camber
Surface preparationCleanliness compared to SA 2½ reference standard
CoatingWet and dry film thickness, digital gauge
BoltingCalibrated torque wrench per IS / AISC
DispatchPiece marking, count, protection, QC and production sign-off
Certifications

Certifications and Compliance

Stated plainly, so a procurement team can check it. What is in place today, and what is in progress.

In place todayDetail
Raw material complianceBIS-licensed steel from TATA, JSW and SAIL under IS 2062 and IS 14246; Mill Test Certificates verified per consignment
Design code complianceIS 800:2007, IS 875, IS 801, IS 1893; AISC 360 and MBMA where specified; BS 5950 and EN 1993 for export
Calibrated QC instrumentsWeld gauges, dye penetrant kits, coating thickness gauges, SA 2½ comparators, torque wrenches, dimensional instruments
Third-party testingActive tie-ups with NABL-accredited laboratories for salt spray, tensile, coating adhesion and chemical composition
TraceabilityHeat-number traceability from raw plate to finished member; weld log against welder and procedure; dispatch sign-off by QC and production
StatutoryGST registered, Udyam / MSME certified, PF, ESI and Factories Act compliant
In progressStatus
ISO 9001:2015 — Quality managementUnder application
ISO 14001:2015 — Environmental managementUnder application
ISO 45001:2018 — Occupational health & safetyUnder application
ISO 3834-2 — Welding quality for fabricated steelPlanned

The three ISO standards are being taken as one integrated management system. Update this table the moment each certificate is issued, and link the PDF.

Investment

What Determines PEB Cost

Two quotations for what looks like the same building can differ by a wide margin, and it is almost never dishonesty — it is scope. Before comparing any two PEB quotes, check they cover the same things.

1

Clear span

The distance between columns is the biggest driver of steel tonnage. Do not buy a span you will never use.

2

Eave height

Height increases column sections, wind loading and cladding area at the same time.

3

Crane loads

A building designed for an EOT crane is a different structure at identical dimensions.

4

Sheet specification

Bare galvanized, colour-coated or insulated panel — a wide range over the same roof area.

5

Foundation & soil

Usually quoted separately. Ask whether it is in or out before you compare.

6

Site location

Transport of fabricated sections and erection crew availability vary by region.

7

Scale

Cost per square foot falls as the building gets larger, up to a point.

₹

How we quote

Against a scoped bill of quantities, with steel, civil, flooring and erection priced separately — so you can compare like with like.

We quote against a scoped bill of quantities, so you can see steel, civil, flooring and erection separately rather than as a single per-square-foot number.

Next Step

Discuss Your PEB Project

Share your project location, intended use and approximate building area. Our team will discuss the civil scope, steel-building requirements and next steps with you.

+91 73975 33975
sales@infragreen.biz

Request Project Consultation

🔒 Your shared details are confidential

FAQ

Frequently Asked Questions

What is a pre-engineered building?

A pre-engineered building is a steel structure whose members are designed and fabricated in a factory to a specific set of loads and dimensions, then bolted together on site. Sections are tapered to the forces at each point, which uses less steel than conventional hot-rolled construction and shortens the site programme.

Does Infra Green manufacture the steel in-house?

Yes. Cutting, assembly, welding, surface preparation, painting and dispatch all happen at our own facility at a capacity of 1,250 MT per month, under our own ISO 9001:2015 quality system.

Do you take PEB projects outside Tamil Nadu?

Yes, where the project scale justifies mobilising fabrication and erection to site. Our factory and the majority of our completed projects are in Tamil Nadu. The plant is within reach of Chennai, Tuticorin and Cochin ports, and we detail to BS 5950 and EN 1993 where an export project calls for it. For sites elsewhere, ask us early and we will be straight about transport and erection implications before you invest time in drawings.

What does a PEB cost per square foot in India?

It depends entirely on scope. A supply-and-erect rate covering frame, roofing and cladding is far below a turnkey rate that includes foundation, flooring and services. Clear span, eave height, crane loads, sheet specification, soil condition and site location all move the number. Send us the building and we will quote against a scoped bill of quantities, with the supply-and-erect and turnkey figures shown separately.

Is the foundation included in a PEB quotation?

Usually not, unless the contract is explicitly turnkey. Because Infra Green also carries out civil works, we can quote the foundation and steel together under one scope — which is the most common reason clients ask us to take the whole building.

How long does a PEB take to build?

Fabrication runs in parallel with foundation work on site, which is where pre-engineered construction gains time over conventional building. The actual programme depends on built-up area, soil condition, statutory approvals and how quickly drawings are approved — we give a programme at concept stage, not after the order, and milestone dates go into the contract rather than staying a verbal estimate.

Can a pre-engineered building be extended later?

Yes. Bays can be added to the length without disturbing the existing structure, provided the original design anticipates it. Tell us at design stage if you expect to expand, and we will set bay spacing and gable detailing accordingly.

Do you handle multi-storey steel buildings?

Yes. Our completed work includes a G+3 multi-storey steel structure of 30,000 sq ft for CTC International in Tiruppur.

Which steel does Infra Green use?

Structural steel is sourced from BIS-licensed mills including TATA Steel, JSW Steel and SAIL, to IS 2062. Colour-coated PPGI and PPGL sheets are sourced to IS 14246 and IS 15961. Mill Test Certificates are verified against every incoming consignment, and heat numbers are traceable from raw plate through to the finished structural member.

Is all the welding robotic?

No. Two Yaskawa robotic welding stations are deployed for suitable repetitive structural components, and an automated PTW and tack welding line produces built-up beams. Twelve MIG and ARC stations handle the balance of fabrication. The combination supports repeatable weld paths and consistent output — it does not mean every weld on a building is robotic.

Can you provide third-party test reports?

Yes. In-house QC covers weld gauges, dye penetrant testing, coating thickness measurement, surface cleanliness comparison to SA 2½ and calibrated torque wrenches. For salt spray, tensile, coating adhesion and chemical composition testing we work with NABL-accredited laboratories and can supply batch-wise third-party reports for tender and export requirements.

What makes Infra Green different from other PEB manufacturers in India?

Two things. First, the plant is automated rather than purely manual — Yaskawa robotic welding, CNC plasma cutting with Hypertherm technology, an automated PTW beam line, and our own purlin and colour-roof profile lines, so primary structure and roofing come from one production system. Second, we carry the civil scope as well as the steel, so the foundation and the frame sit under one contract instead of two.

Where is your PEB manufacturing facility located?

Our 60,000 sq ft covered fabrication plant is at 228/2B-1, NN Pudhur, Pongalur, Tirupur District, Tamil Nadu, on a 35-acre site with yard, storage and expansion land. The corporate office is at JK Business Center, Sowripalayam Road, Coimbatore. Chennai, Tuticorin and Cochin ports serve export projects, and Coimbatore International Airport is about 40 km away.

Which design codes do you work to?

Structures are designed and detailed to the code specified for the project: IS 800:2007, IS 875 Parts 1–5, IS 801 and IS 1893 for Indian projects, AISC 360 and MBMA where required, and BS 5950 or EN 1993 (Eurocode 3) for export work. Analysis and detailing use STAAD Pro, Tekla Structures and AutoCAD.