SDR Garments Avinashi Steel Building Construction

SDR Garments Avinashi Steel Building Construction

Project Overview

SDR Garments Avinashi wants to open a new showroom for its fast-growing business. They are looking for a futuristic and optimal solution for their showroom. InfraGreen approached them and explained about pre-engineered buildings and the cost

Our Solutions

The infraGreen team did research on Pre-engineered buildings as per the requirements given by the SDR Garments Team. We analyzed the land area and drafted a construction plan.

Within a short period, we can able to give them a neat Steel building construction plan. The PEB plan includes the Showroom construction procedures, Cost cutting due to PEB construction, Metal roofing systems plans, Ventilation plans, and Lighting plans.  As per the specs, PEB construction was done and handed over to the clients.

Advantages

The Major Advantages for the PEB Construction method for the client

1.Reduction in cost.

2.Time saved in construction.

3.Starting the new showroom as early as possible.

Project Details

Client
SDR Garments
Place
Avinashi
Year
2022
Size
10000 Sq ft
Time
3 Months