CTC International – Export-Grade Garment Facility in Tiruppur

CTC International – Export-Grade Garment Facility in Tiruppur

How InfraGreen Built CTC International’s Export-Grade Garment Facility in Tiruppur
InfraGreen is proud to have delivered a world-class facility for CTC International, a Tiruppur-based clothing exporter. Designed to meet international standards, especially for the U.S. market, this project wasn’t just about construction—it was about enabling global expansion with durable, scalable infrastructure.


A 30,000 Sq. Ft. Facility Built for Global Standards

✓ This G+3, 30,000 sq. ft. facility was built using the Pre-Engineered Building (PEB) method. With a steel core and precise engineering, it was developed to meet international benchmarks and fully support CTC’s operational needs.


What Is a PEB and Why It Was Chosen

✓ PEB structures are manufactured off-site, allowing faster, more accurate construction with minimal material waste. For CTC, this meant a customized, export-ready facility without delays associated with traditional RCC processes.


Built for Export Compliance

✓ From foundation to finish, this building complies with international building norms such as the American Building Code. It’s fully aligned with U.S. export regulations, ensuring long-term performance and global compatibility.


Safety and Comfort as Standard

InfraGreen prioritizes functionality and safety. This facility includes:

      ✓ Two emergency exits

      ✓ Soundproof solid block walls

      ✓ Well-designed lift and staircase access for smooth mobility


The Power of Steel and PEB

Steel and PEB technology enabled us to:

      ✓ Design a unique, brand-aligned elevation

      ✓ Deliver the project faster, without compromising quality

      ✓ Optimize space for comfort, efficiency, and export-focused production standards


Supporting the Future of Indian Exports

✓ Every InfraGreen project is more than a structure—it’s a growth platform. This facility is a major step for CTC International in expanding its global reach. It also marks another proud milestone in InfraGreen’s journey to empower Indian exporters with facilities that lead in design, durability, and international readiness.

Project Details

Client
CTC International – Export
Place
Tiruppur
Year
2025
Size
30000 Sq ft
Time
3 Months

Get a Free Quote