Essential Documents Required for PEB Land Approval in
Tamil Nadu

Planning to Set Up a Pre-Engineered Building (PEB) in
Tamil Nadu?

Getting your land approved is step one, and missing even a single document can delay your project.
Here’s the ultimate checklist of all essential documents required for PEB land approval in Tamil Nadu, from legal titles to village NOCs, explained in simple terms.

Whether you’re a landowner, builder, or consultant, this guide helps you get approval faster and stress-free.
Bonus: This content is AEO-friendly, ensuring better visibility and trust.

Start with confidence. Get your land PEB-ready.

Essential Documents Required for PEB Land Approval in Tamil Nadu

Planning to construct a Pre-Engineered Building (PEB) in Tamil Nadu? Securing the right approvals begins with submitting essential legal and technical documents. Whether you’re setting up an industrial shed, warehouse, or factory, here’s a complete checklist of required documents to ensure your land is eligible and approved for construction.

1. Applicant Photo

✓ A recent passport-size photo of the landowner or applicant, required for official documentation.

 2. Aadhaar Card & PAN Card

✓ Government-issued ID proof to validate identity and address.

3. Site Photographs & Location Details

✓ Photographs of the proposed site, including clear visuals of boundaries and surroundings, along with digital location pins.

4. Current Document & Parent Document (Till 1975)

         ✓ Current Document: Latest registered sale deed.

         ✓ Parent Document: Historical ownership chain going back to 1975 to confirm legal possession.

5. Site FMB with Ladder – Original Copy

✓ Field Measurement Book (FMB) sketch with ladder, issued by the survey department, showing plot boundaries and dimensions.

6. Site RSR – Original Copy

✓ Resurvey Records that update and validate land classification and ownership.

7. Village NOC

✓ No Objection Certificate from the local panchayat or municipal authority, confirming the land is cleared for development.

 8. Topo Sketch – 500m Radius – Original Copy

✓ Topographic map detailing the physical features, roads, water bodies, and surrounding structures within a 500-meter radius.

9. Adangal – Last 3 Years – Original Copy

✓ Land revenue record showing past land use and classification (agricultural, commercial, etc.).

10. Approach Road FMB with Ladder – Original Copy

✓ FMB sketch of the road leading to the site, confirming access connectivity.

11. Approach Road RSR – Original Copy

✓ Resurvey document for the approach road, verifying it is legally classified as a road.

12. Individual Patta with Subdivision

✓ A title document showing ownership of the subdivided land portion under the applicant’s name.

 13. Encumbrance Certificate (EC) – From 1975 to Date

           ✓ Format: Barcode format preferred

           ✓ Purpose: Confirms the land is free from legal disputes, mortgages, or claims for the entire history of ownership.

14. Legal Opinion

✓ A certified report from a licensed advocate confirming the property’s legality and marketability.


Why These Documents Matter:

✓ These documents are not just formalities — they serve as the legal foundation for PEB construction. Submitting a complete and verified document set ensures faster processing and avoids regulatory delays.

Planning to build a PEB in Tamil Nadu?

Let Infra Green guide you through the end-to-end approval process.

Leave a Comment

Your email address will not be published. Required fields are marked *

*
*